CAMBODIA: Kampong Thom - Results
Abstract of the analysis of DRE infrastructures and electrified villages in Kampong Thom Province - Cambodia
OBJECTIVES
- obtain a clear identification of both favourable factors and barriers related to the establishment and operation of decentralized rural infrastructures,
- be able to precisely identify the villages electrified by the power grid or by decentralised operators.
MAIN RESULTS
- 12 Rural Electricity Enterprises servicing 5 189 households in the province.
- Important role of 12 REEs in the provision of electricity in the rural areas.
- Rural households not served by REEs typically rely on recharging batteries for electricity.
- 2 of the 12 REEs using biomass gasification technology.
- By the REEs biomass gasification and bio-diesel are considered to be the most suitable technologies for rural electrification of Kampong Thom province.
- No renewable energy experts seem to be present in the province.
- In Kampong Thom province, areas within a 40 km radius of the provincial main town are considered Potential Area for Grid Extension.
- Outside these areas, electrification by mini-grids most promising option for areas with sufficient population density.
- For (rural) areas with a low population density, electrification by batteries probably remain the only option for the short to medium term.
- Population density will be a key indicator for determining the economic feasibility of different kinds of electricity system (mini-grid or batteries).
OPTIONS RECOMMENDED AND SUGGESTIONS FOR NEXT PLANNING STEPS
- Biomass fuelled mini-grids in areas with sufficient population density.
- Solar PV systems (either Solar Home Systems or solar/biomass powered Battery Charging Stations) for electrification of areas with a low population density.
- Population density will be a key indicator for determining the economic feasibility of different kinds of electricity system (mini-grid or batteries).
- Combination of biofuel and PV mini-grids to meet variable load demands.
- Detailed (provincial) maps of Kampong Thom indicating population density, renewable energy resources and land use should be drafted.
- Identification of areas with potential for electrification by (biomass fuelled) mini-grids can be done based on the provincial maps followed by a more detailed field analysis of those areas, in order to confirm the feasibility of grid electrification.
Download the public report
|
 |

|